Thursday, May 16, 2024
74.0°F

Rock work

| April 23, 2008 1:00 AM

A loader bucket dumps rocks into a narrow deep ditch while Knife River worker Chris Freeto helps build a French drain underneath the Stillwater River bridge on U.S. 93 near West Reserve Drive on Tuesday. The Montana Department of Transportation determined the bridge was "too bumpy" due to water that accumulated in the soil underneath the bridge. The system installed Tuesday will help solve the water problem.