Thursday, March 28, 2024
36.0°F

Legals for March, 3 2023

| March 3, 2023 12:00 AM

No. 29194 PUBLIC OPPORTUNITY TO PROTEST ISSUANCE OF ONE NEW MONTANA ALL-ALCOHOLIC BEVERAGES LICENSE  BENTON PUB LLC (STACIA FUZESY, Owner(s)) has applied for one new Montana All-Alcoholic Beverages License No. 07-999-2344-002 to be operated at NIMBLE GOAT, 8541 Montana Hwy 35, Bigfork, Flathead County. The public may protest this license transfer in accordance with the law.  Who can protest this transfer? Protests will be accepted from residents of the county of the proposed location Flathead County, residents of adjoining Montana counties, and residents of adjoining counties in another state if the criteria in 16-4-207(4)(d), Montana Code Annotated (MCA), are met.  What information must be included? Protest letters must be legible and contain (1) the protestor’s full name, mailing address, and street address; (2) the license number 07-999-2344-002 and the applicant’s name BENTON PUB LLC; (3) an indication that the letter is intended as a protest; (4) a description of the grounds for protesting; and (5) the protestor’s signature. A letter with multiple signatures will be considered one protest letter.  What are valid protest grounds? The protest may be based on the applicant’s qualifications listed in 16-4-401, MCA, or the grounds for denial of an application in 16-4-405, MCA. Examples of valid protest grounds include: (1) the applicant is unlikely to operate the establishment in compliance with the law; (2) the proposed location cannot be properly policed by local authorities; and (3) the welfare of the people in the vicinity of the proposed location will be adversely and seriously affected.  How are protests submitted? Protests must be postmarked to the Department of Revenue, Office of Dispute Resolution, P.O. Box 5805, Helena, Montana 59604-5805 on or before March 13, 2023.  What happens if the transfer is protested? Depending on the number of protests and the protest grounds, a public hearing will be held in Helena or Bigfork. All valid protestors will be notified of the hearing’s time, date and location. Hearings typically are scheduled within 90 days. A protester’s hearing testimony is limited to the grounds in the protester’s letter. Following the hearing, the Department of Revenue will notify the public whether the license transfer is approved or denied.  How can additional information be obtained? The cited MCA statutes are online at leg.mt.gov/bills/mca_toc/. Questions may be directed to Lisa Patzer, Compliance Specialist for the Department of Revenue’s Alcoholic Beverage Control Division, at 444-4332 or LPatzer@mt.gov. February 10, 17, 24, and March 3, 2023 MNAXLP __________________________

No. 29198 Montana Eleventh Judicial District Court Flathead County In the Matter of the Name Change of Sara Anne Dunbar: Sara Anne Dunbar, Petitioner Cause No.: DV-23-080 HEIDI J ULBRICHT Notice of Hearing on Name Change This is notice that Petitioner has asked the District Court for a change of name from Sara Anne Dunbar to Sara Wolfe. The hearing will be on 3/29/2023 at 1:30 p.m. The hearing will be at the Courthouse in Flathead County. Date: 02/07/2023 PEG L. ALLISON Clerk of District Court BY: /s/ BRITTNEY COLACINO Deputy Clerk of Court February 3, 10, 17, and March 3, 2023 MNAXLP __________________________

No. 29237 STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK IN THE GENERAL COURT OF JUSTICE SUPERIOR COURT DIVISION FILE NO.: 23-CVS-202 BRADFORD AQUATIC GROUP, LLC, Plaintiff, v. KEVIN BARBER, Defendant. NOTICE OF SERVICE OF PROCESS BY PUBLICATION TO: KEVIN BARBER TAKE NOTICE that a pleading seeking relief against you has been filed in the above-entitled action. The nature of the relief being sought is as follows: (1) a judgment against you for all damages of any type, including punitive damages, suffered by Plaintiff in a principal amount in excess of $25,000.00, plus costs, interest, and any attorneys’ fees permitted by law, as a result of your multiple breaches of contract, misappropriation of trade secrets, and slander per se; (2) entry of a temporary restraining order and preliminary injunction prohibiting you from (i) retaining the confidential, proprietary information exclusively belonging to Plaintiff, (ii) directly or indirectly disclosing the confidential, proprietary information exclusively belonging to Plaintiff, and (iii) using, for any reason, the confidential, proprietary information exclusively belonging to Plaintiff; (3) entry of an order granting expedited discovery; (4) that Plaintiff have a trial by jury on all issues so triable; and (5) that Plaintiff have and recover such other and further relief as the Court deems just and proper. You are required to make defense to such pleading not later than April 12th, 2023, which is 40 days after the first publication of this notice and upon your failure to do so Plaintiff will apply to the Court for the relief sought. This the 3rd day of March, 2023. /s/Joseph A. Schouten Joseph A. Schouten N.C. State Bar I.D. No.: 39430 email: docket@wardandsmith.com * email: jas@wardandsmith.com** Isabelle M. Chammas N.C. State Bar I.D. No.: 58253 email: imchammas@wardandsmith.com** For the firm of Ward and Smith, P.A. Post Office Box 7068 Wilmington, NC 28406-7068 Telephone: 910.794.4800 Facsimile: 910.794.4877 Attorneys for Plaintiff March 3, 10, 17, 2023 MNAXLP __________________________

No. 29239 INVITATION TO BID Meadow Lake County Water and Sewer District (MLCWSD), a local government entity located in Columbia Falls Montana, will receive sealed bids for the TELEMETRY COMMUNICATIONS - ELECTRICAL INTEGRATION PROJECT. Bidding documents may be examined at the Office of APEC Engineering Inc, 75 Somers Road, Somers, Montana 59932. Bids will be received by Office of APEC Engineering Inc, 75 Somers Road, Somers, Montana 59932 until 2:00 PM on Friday, March 17, 2023. All bids will be publicly opened and read aloud in the Office of APEC Engineering Inc, 75 Somers Road, Somers, Montana 59932 at 2:00 PM on Tuesday, March 21, 2023. MLCWSD will review and award bids at a meeting scheduled for 1:00 PM Friday, March 24, 2023. MLCWSD reserves the right to reject any or all bids, to waive irregularities, and to accept any bid which it deems most advantageous. The Project includes the following work: The project primarily consists of 9 sites made up of numerous wells, booster pumps stations, reservoirs, and sewer pump stations. The desire of the MLCWSD is to provide back-up power for the sites that do not have it, and to upgrade the water and sewer SCADA components to allow for remote monitoring of all sites and control of all well pumps. Labor, and equipment required to complete. Main Control Station (Site A) All work at this site shall be by the control’s contractor. No electrical work at this site. Main Sewer Lift Station #1 & Well #1 (Site B) Provide for remote alarm annunciation and run status of the existing generator. Well #2 Building (Site C) Install a generator back-up power system with an automatic transfer switch to power the well pump. Provide for remote alarm annunciation and run status of the generator. Well #3 Building (Site D) Future Location – no work to be performed under this contract. Main Reservoir Tank #1 (Site E) Install a new mechanical level indicator on the exterior of the tank, install a second, redundant pressure transducer in the valve vault, all work at this site shall be by the control’s contractor. No electrical work at this site. Tamarack Pump Station & Tank #2 (Site F) Install a new remote telemetry unit (RTU) to remotely monitor the tank level, system inlet/outlet pressure, and booster pump run status. Complete all input/output connections to the RTU as specified in the plans, specifications, and written scope of work. Install a general back-up power system with an automatic transfer switch to power the booster station. Provide for remote alarm annunciation and run status of the generator. Sewer Lift Station #2 (Meadow Lake West) – Site G Install a new remote telemetry unit (RTU) to remotely monitor the sewer lift station level and high-level alarms. Complete all input/output connections to the RTU as specified in the plans, specifications, and written scope of work. Install an automatic transfer switch to start the back-up generator at sewer lift station #3. The generator shall back-up both lift stations #2 and #3. Sewer Lift Station #3 (Meadow Lake Drive) – Site H Install a new remote telemetry unit (RTU) to remotely monitor the sewer lift station level and high-level alarms. Complete all input/output connections to the RTU as specified in the plans, specifications, and written scope of work. Install a generator back-up power system with an automatic transfer switch to power both lift stations #3 and #2. Provide for remote alarm annunciation and run status of the generator. Sewer Lift Station #4 (Mountain Watch) – Site I Install a new remote telemetry unit (RTU) to remotely monitor the sewer lift station level and high-level alarms. Complete all input/output connections to the RTU as specified in the plans, specifications, and written scope of work. Provide for remote alarm annunciation and run status of the existing generator. March 3, 10, 2023 MNAXLP __________________________