Monday, November 18, 2024
37.0°F

Unscheduled early out for Flathead High

| November 13, 2007 1:00 AM

A faulty wire knocked out power Monday to Flathead High School. The outage began at about 1:45 p.m. As of 4 p.m., Flathead Electric Cooperative crews were still trying to make repairs. The wire ran from a utility pole to the school, so the school was the only building affected. The outage forced administrators to send students home early.