Friday, October 11, 2024
45.0°F

Legals January 17, 2020

| January 17, 2020 5:10 AM

No. 26709 MONTANA ELEVENTH JUDICIAL DISTRICT COURT, FLATHEAD COUNTY In re the Marriage of: Kim Coles Avery, Petitioner, and Chris Wilcox Avery II, Respondent Cause No.: DR 19-948A SUMMONS FOR PUBLICATION THE STATE OF MONTANA SENDS GREETINGS TO THE ABOVE-NAMED RESPONDENT: You, the Respondant, are hereby summoned to answer the Petition in this action, which is filed with the Clerk of this Court, a copy of which is herewith served upon you, and to file your answer and serve a copy thereof upon the Petitioner within twenty-one (21) days after service of this Summons, exclusive of the day of service; and in case of your failure to appear or answer, judgment will be taken against you for the relief demanded in the Petition. DATED this 30th day of December, 2019 /s/ PEG L ALLISON Clerk of Court /s/ Amanda Mosser Deputy Clerk January 3, 10, 17, 2020 MNAXLP _________________________

No. 26726 Montana Eleventh Judicial District Court Flathead County In the Matter of the Name Change of Daedalus Pierce-Metteer: Dakota Brown, Petitioner Cause No. DV-19-1370D DAN WILSON Notice of Hearing on Name Change of Minor Child This is notice that Petitioner, Dakota Brown, has petitioned the District Court for a change of name for Daedalus Pierce-Metteer to Daedalus Steinert-Brown. The District Court Judge will hear the petition for Name Change on March 3rd, 2020 at 1:30 p.m. The hearing will be at the Courthouse in Flathead County. Objections may be filed any time before the hearing by any person who can show good reason not to change the name. Date: January 2, 2020 PEG L. ALLISON Clerk of Court By: /s/ Sarah Arrigoni Deputy Clerk of Court January 10, 17, 24, 31, 2020 MNAXLP __________________________

No. 26731 PUBLIC NOTICE WMR FY20-425 The Department of Environmental Quality (DEQ) is accepting public comments specific to new underground storage tanks to be installed near Kalispell, Montana at the proposed Mountain West Coop Kalispell. This is only a summary of the proposed project. The entire Environmental Assessment (EA) can be viewed at http://deq.mt.gov/Land/ust/ea. DEQ has prepared the following Environmental Assessment (EA) as required by the Montana Environmental Policy Act (sections ARM 17.4.607(2) and ARM 17.4.609(2)). This project involves installing one 16,000-gallon triple-compartment Containment Solutions Fiberglass Reinforced Plastic (FRP) double-walled Underground Storage Tank (UST) containing Off-Road Dyed Diesel (4,000 gallon compartment), Premium Roadmaster Diesel (8,000 gallon compartment), and Premium Unleaded Gasoline (4,000 gallon compartment), and one 15,000 dual-compartment Containment Solutions FRP double-walled UST containing Diesel # 2 (8,000-gallon compartment) and Regular Unleaded Gasoline (7,000-gallon compartment). All of the UST systems will utilize secondarily contained Franklin Fueling Systems APT XP secondary contained double-walled flexible pipe. The proposed project will add five (5) new UST systems to the newly developed Mountain West Coop Kalispell, located at 700 Rail Park Drive, Kalispell, MT 59901. Specific installation plans include the following materials and monitoring systems: Tank(s): This project involves installing the following five (5) tanks: 4,000-gallon dyed diesel, 8,000-gallon premium diesel, 4,000-gallon premium unleaded gasoline, 8,000-gallon # 2 diesel, and 7,000-gallon regular unleaded gasoline. All five tanks will be Containment Solutions FRP double-walled UST systems. Each tank will be utilized by Mountain West Coop Kalispell as a petroleum re-fueling site. Piping: All product piping associated with this project will be Franklin Fueling Systems APT XP secondary contained double-walled flexible pipe. Approximately 400 feet of double-walled Franklin Fueling Systems APT XP piping will be utilized in this project. Sumps: Containment Solutions fiberglass tank-top sumps will be installed around each tank's submersible turbine pump. Franklin Fueling Systems Large Mouth Polyethylene under-dispenser containment sumps will be installed under each dispenser. Each tank and piping system will be continuously monitored. Monitoring will be accomplished via internal tank probes, interstitial tank sensors, as well as continuous sensor monitoring in all containment sumps and electronic line leak detection with programmed 0.2 gph shutdown rate for each of the piping runs. A Veeder Root TLS 450 plus automatic tank gauge (ATG) will continuously monitor all operational parameters. DEQ prepares EAs to examine and document the effects of a proposed action on the quality of the human and physical environment. After a ten-day public comment period, DEQ will consider the substantive comments received in response the EA and proceed with one of the following actions: a) determine that an Environmental Impact Statement (EIS) is necessary; b) determine that the EA did not adequately reflect issues raised by the proposed action and issue a revised EA; or c) determine that further environmental analysis is not necessary and make a final decision on the proposed action with any modification deemed necessary as a result of analysis in the EA and public comment. If you care to comment on this proposed project or the attached EA, please write or email the Waste Management and Remediation Division. Comments must be in writing and must be received by January 23, 2020. Our email address is dequstprogram@mt.gov and our mailing address is DEQ/UST, PO Box 200901, Helena, MT 59620-0901. January 14, 15, 16, 17, 18, 2020 MNAXLP _________________________

No. 26729 Peg L. Allison Clerk of District Court Flathead County Justice Center 920 South Main Street Kalispell, MT 59901 (406) 758-5906 IN THE DISTRICT COURT OF THE ELEVENTH JUDICIAL DISTRICT OF THE STATE OF MONTANA, IN AND FOR THE COUNTY OF FLATHEAD IN THE MATTER OF: J.L. YOUTH IN NEED OF CARE. Cause No. DN-19-100(B) SUMMONS FOR PUBLICATION To: David Rodriguez Lopez, birth father of the above-named child: YOU ARE HEREBY NOTIFIED that a Petition has been filed in the above-entitled Court by the Montana Department of Public Health and Human Services, Child and Family Services Division, 121 Financial Drive, Suite C, Kalispell, MT 59901, requesting emergency protective services, adjudication of the above-named child as a youth in need of care, and temporary legal custody. NOW, THEREFORE, YOU ARE HEREBY DIRECTED to appear on Friday, January 24, 2020, at 1:30 p.m. before the Honorable Robert B. Allison, District Judge, Department 2, Flathead County Justice Center, 920 South Main Street, Third Floor, Kalispell, Flathead County, MT, then and there to show cause, if any you may have, why the Petition should not be granted. V.P.H. was born on January 29, 2004 in Fort Worth, Texas. The birth mother is Jeanne Floyd. You have the right to representation by an attorney in these proceedings. If you are unable to afford an attorney, the Court will appoint an attorney to represent you. Your failure to appear at the hearing constitutes a denial of your interest in the above-named child, which denial may result, without further notice of this proceeding or any subsequent proceedings, in the Court entering judgment by default against you for all relief requested in the Petition. A copy of the Petition is filed with the Clerk of District Court for the Eleventh Judicial District Court in and for Flathead County, 920 South Main, Third Floor, Kalispell, MT, 59901, telephone (406) 758-5870. WITNESS my hand and Seal of this Court this 7th day of January, 2020. PEG L. ALLISON Clerk of District Court By: /s/ CASSANDRA LOVELESS Deputy Clerk January 10, 17, 24, 2020 MNAXLP __________________________